( 01 )
Tokens before screens
Color, space, and type were defined as tokens first, so a new screen starts on-brand.
Brief
Interface and design tokens for a B2B workspace — built for weekly releases so craft keeps pace with engineering without losing the brand.
Nox
02
( The mark )
( 01 )
Color, space, and type were defined as tokens first, so a new screen starts on-brand.
( 02 )
Empty, loading, and error states were drawn with the same care as the happy path.
( 03 )
The front-end lead reviewed every component before it entered the library.
04
( Desk )
“We came in with a product that worked and a story that didn’t. Their team tightened both — identity, web, and motion landing as one system our team can actually keep shipping.”
Jonah Ellis · Head of Product, Kite
05
( What held )
42
Components
6
Release cycles
14 wk
Cadence